Team Experience Highlights

Eidco's team of seasoned professionals provides counsel that delivers value. At Eidco, your success is our success, which is why we ensure that the project is completed to the highest possible standards, on time and within budget.


  • Retail
  • Health Care
  • Office
  • Multi-Family

Dunham's Sports (33,873 SF)

$1,025,000

Baxter, MN

Complete interior demolition of previous K-Mart space including removal of all walls, floors, ceilings, finishes, mechanical, electrical and plumbing systems. FAST TRACK project with 2.5 weeks for 7 week project. 5,000sf structural steel and masonry addition at new main entry. Vanilla box build out for Dunham's Sports, including all new walls, doors, finishes, mechanical, electrical, plumbing and fire protection systems.  New dryvit facade at south building elevation and installation of Dunham's signature entry signage. New storefront glass storefront and vestibule system. Addition of new concrete and masonry loading docks at north elevation and north parking lot renovation. Installation of retailer provided displays and casework.

Big Lots Stores (31,827 SF)

$1,060,000

Baxter, MN

Complete interior demolition of previous K-Mart space including removal of all walls, floors, ceilings, finishes, mechanical, electrical and plumbing systems. FAST TRACK project with 2.5 weeks for 7 week project. Structural steel and EIFS entry canopy addition at new main entry, including EIFS facade at complete south elevation. Vanilla box build out for Big Lots Stores, including all new walls, doors, finishes, mechanical, electrical, plumbing and fire protection systems. New storefront glass storefront and vestibule system. Addition of new concrete and masonry loading docks at north elevation and north parking lot renovation. Installation of retailer provided displays and casework.

rue21 (4,500 SF)

$147,000

Baxter, MN

Interior demolition of two adjacent existing retail spaces and partial expansion into a third for a combined total of 4,500 square feet. Complete interior build out including new flooring, partitions, electrical, plumbing, HVAC distribution, painting, graphics, lighting, and retailer supplied displays. Project was completed under an expedited schedule with trades onsite 24/7 for a total, start to finish period of 18 days.

rue21 (5,000 SF)

$153,000

Watertown, SD

Demolished existing space and converted it into a rue21 with exposed deck ceiling. This was a complete turnkey build from new storefront, polished concrete sales floor, install all millwork, new back of house and all new finishes.

Famous Footwear (4,980 SF)

$158,000

Watertown, SD

Converted two vacant spaces into one Famous Footwear including all new restroom facilities, new HVAC system and modified fire sprinkler system. This was a turnkey deal including all new finishes and fixture installation.

Banner Wholesale Grocers (50,000 SF)

$3,000,000

Chicago, IL

This project included the construction of a small wholesale grocery store with mezzanine offices as well as a warehouse storage facility with remote masonry check-out areas.

Costco (154,199 SF)

$11,000,000

Columbus, OH

This project involved the coordination of Costco's site development requirements with the ongoing campus development by two other general contractors working for the developer. Coordination of design and engineering between the multiple parties including two civil engineers and two architects.

Costco (154,199 SF)

$10,750,000

Lousiville, KY

This project included food preparation areas, coolers, freezers, an auto center, and a small eye exam center. Costco buildings are built in 110 days from breaking ground to grand opening. Approximately day 76 temporary certificate of occupancy is required to accommodate tenant racking with a fully operational life safety system satisfying local fire department requirements. This project also included a gas station in the corner of the site.

Dick's Sporting Goods (51,000 SF)

$5,300,000

Arlington Heights, IL

The project consisted of typical retail finishes including vinyl plank flooring, a slat wall perimeter with extensive millwork, and audio/visual work throughout. This facility included a small indoor driving range, putting green, and archery range.

Town and Country Mall (93,000 SF)

$7,000,000

Arlington Heights, IL

Demolition of portions of existing mall, new construction and remodel of brick/block/E.I.F.S. mall spaces to accommodate Old Country Buffet, five spec retail facilities, a management office, and Dick's Sporting Goods. Remodel storefront of remaining mall frontage to match new construction including Dominick's and Walgreens. Roof overlay for all remaining mall buildings. All work performed in a fully functioning mall.

Circuit City (20,000 SF)

$4,200,000

Bolingbrook, IL

This is a brick/block/and EIFS stand alone building. Typical retail finishes were used throughout with an extensive electrical system to accommodate all the electronics displayed in the space. All work performed within a fully operational mall campus located in between two anchor tenants.

National City Bank (3,500 SF)

$850,000

Waukegan, IL

This brick and block building includes two drive through banking lanes as well as an ATM station.

Advance Auto Parts (7,500 SF)

$1,100,000

Waukegan, IL

This block building includes a storefront with a double acting entrance door and black colored concrete parking stalls to match the asphalt drive aisles.

Mr. Thrifty (8,000 SF)

$200,000

West Chicago, IL

Small retail store selling used furniture, clothing, and equipment.

Niko's Deli (1,300 SF)

Naperville, IL

Deli with full cooking kitchen capabilities.

Northwestern Publishing House (57,000 SF)

Brown Deer, WI

The project entailed remodeling a Christian book store and publishing house while maintaining full operation.

Stone Hill Center Exterior Renovation: (50,000 SF)

$1,000,000

Fox River Grove, IL

Complete Exterior update of Shopping Center from Western Rustic to Traditional Contemporary. Removal of existing façade of Cedar shake roofing and rough sawn timber framing, re-build façade with new mansard design of contemporary design, finished with structural round columns, and synthetic stucco.

Stone Hill Center Tenant Improvements: (20,000 SF)

Fox River Grove, IL.

Divide existing 20,000 square foot open space unit: Removal of mezzanine, front offices and restrooms. Build out of:

Flooring Outlet Store (10,000 SF)

$417,600

Retail front space, new front entry and windows, warehouse storage, offices and restrooms.

Medical Services Company (9,500 SF)

$382,000

New entry, offices, restrooms, and medical equipment storage warehouse area.

Fantastic Sam's Hair Salon (500 SF)

$25,000

Restroom, shampoo stations, and stylist stations.

Chiropractor's Office (2,000 SF)

$76,000

Fox River Grover, IL

Radius Glass Block Vestibule, patient examining rooms, doctors private office, receptionist area, and x-ray room.

Gift & Collectibles Shop (3,000 SF)

$138,700

Fox River Grover, IL

Custom display wall units, office, and custom lit artwork display room.

New Construction for Stone Hill Center Owner (24,000 SF)

$1,458,000

Fox River Grove, IL.

Two Ground up buildings: 12,000 square feet each, for use as stand alone financial bank.

Chase Bank (5,625 SF)

$274,000

This project included an extensive vault build which required an installation of a new staircase and elevator opening cut through the floor into the basement of the building. Mechanical systems, plumbing were tied to the base building four-pipe system control system. The electrical feed was cut from the base build and re metered to the bank. Finishes were installed based on Chase Bank's corporate specifications.

AVANTI'S (8,945 SF)

$117,000

Fox River Grove, IL.

This project included the installation of new Mechanical, Electrical and Plumbing systems separate from the base building. This project required a unique feature of a partial second floor bar area that overlooked the first floor. The heavy timer construction of the 1920's presented a challenge to support the floor like balcony look. This project required a handicap accessible ramp, which required the floor to be below the grade of the existing sidewalk We delivered a white box to the client.

Alliance Real Estate Professional Building

$3,100,000

This project included ground up construction of a masonry and steel structure for a mixed-use building. The exterior of the facility features a modern masonry and brick stone finish, while the interior incorporates sleek, modern finishes and Class A amenities. The building offers medical and retail office space, as well as traditional office suites.

Alpine Family Physicians

$5,708,000

Ground up construction of a two-story masonry and steel frame medical office building. The interior of the medical office includes patient car areas, a laboratory complete with MRI, CT bone density equipment and X-ray services. Parking for 127 vehicles and employee amenities such as business offices, staffing/lunchroom, conference facilities and storage space were also completed.

NueroMed

$3,700,000

Ground up construction of a wood frame and brick veneer structure for a mixed-use building. The 5,000 square foot medical office T.I. included several exam rooms, private doctors offices and waiting area. Finishes included custom millwork, hollow metal frames with pre-stained wood doors and combination of floor finishes including a combination of carpet, vct and ceramic.

Suburban Gastroenterology

$3,716,000

Ground up construction of a single story structural steel and brick veneer medical office building. The exterior features include stone accents and large storefront windows and skylights for extensive natural light throughout the interior space. The new facility includes an ambulatory surgery center with two modern operating rooms as well as pre- and post-operative care stations and consultation rooms. Eight exam rooms, laboratory facilities, doctorsʼ offices, multiple reception areas, fire place, oak moldings, a patient education room, a business office and a full administrative support areas.

Anna Rehab & Nursing Center

$199,843

Provide a new Fire Sprinkler system to bring facility up to code for IDPH including all associated repairs. Upgrade Fire Alarm system to bring facility up to code.

Alton Rehab & Nursing Center

$232,000

Provide a new Fire Sprinkler system to bring facility up to code for IDPH including all associated repairs.

Carbondale Rehab & Nursing Center

$235,571

Provide a new Fire Sprinkler system to bring facility up to code for IDPH including all associated repairs. Upgrade Fire Alarm system to bring facility up to code.

Central Nursing & Rehab Center

$395,000

This project includes the remodeling of the corridors and common areas on floors 1-4. New flooring, acrovyn handrails, paint, and millwork at the nurses stations and reception area.

Cobden Rehab & Nursing Center

$225,663

Provide a new Fire Sprinkler system to bring facility up to code for IDPH including all associated repairs. Upgrade Fire Alarm system to bring facility up to code. Remove and replace existing RTUs and provide new roof curbs to allow vertical discharge. Repair asphalt shingle roof including new ridge vent, and valleys. Repair damaged rafters.

Herrin Rehab & Nursing Center

$89,877

Provide a new Fire Sprinkler system to bring facility up to code for IDPH including all associated repairs. Upgrade Fire Alarm system to bring facility up to code. Provide a new Generator to back-up building systems.

Marion Rehab & Nursing Center

$75,795

Provide a new Fire Sprinkler system to bring facility up to code for IDPH including all associated repairs. Upgrade Fire Alarm system to bring facility up to code.

Midwest Rehab & Nursing Center

$302,000

Provide a new Fire Sprinkler system to bring facility up to code for IDPH including all associated repairs.

Ridgway Rehab & Nursing Center

$221,953

Provide a new Fire Sprinkler system to bring facility up to code for IDPH including all associated repairs. Upgrade Fire Alarm system to bring facility up to code. Provide a new Generator to back-up building systems. Remove and Replace all existing HM doors and frames.

Central Nursing & Rehabilitation Center:

$18,565.14

Concrete Restoration & Interior Repairs

This project included Exterior restoration of the concrete foundation with the repairs of the integrity of the structural concrete and caulking of the below grade window systems, to correct water infiltration into the building. Upon completion of exterior repairs and verification, interior repairs inclusive of drywall, deteriorated framing and mechanical components were remedied. Additionally, replaced 2 deteriorated hollow metal exterior doors, hardware, and finished painted.


$15,246.45

Ejector Pump System Upgrade

This project included the value engineering of an existing ejector pump system, that had been improperly maintained with substandard undersized replacement pump units. Through providing the pump manufacturer the existing conditions of system design, plumbing fixture counts, and power phasing of system, pumps were sized and recommended for the most efficient operation and application. Project was completed with the installation of TWO, 3HP, 3 PHASE, Grinder pumps, to provide the facility with low maintenance system. Additional recommendations were made to the facility, to further insure proper operations of system.

Ridgway Rehabilitation & Nursing Center:

$46,000.00

Hollow Metal Door Replacement Project

This project included the replacement of 28 existing doors with fire rated 2 hour doors and frames. Existing doors were in masonry openings and required full removal of doors, frames and hardware. Installation was completed with the full installation of the frames, doors, hardware and finish painting. Additional repairs of adjacent walls with patching and painting rounded out the final completion.


$72,410.00

Facility Back-up Generator

This project included the sizing of a back-up generator to provide full operational temporary power to the facility in the event of utility outage. The installation of a 100KW, 3 Phase, natural gas unit was installed, due to the remote location of the facility and availability of the fuel source. The project was completed with the restoration of the landscape in conjunction to the install of the system.

Herrin Rehabilitation & Nursing Center:

$53,689.00

Facility Back-up Generator

This project included the sizing of a back-up generator to provide full operational temporary power to the facility in the event of utility outage. The installation of a 80KW, Single Phase, Diesel unit was installed, due to the availability of the fuel source. The project was completed with the restoration of the landscape in conjunction to the install of the system.

Cobden Rehabilitation & Nursing Center:

$7,852.00

Fire Alarm Panel Replacement

This project included the replacement of an existing fire alarm and monitoring panel. Installation of surge protection was installed with new system. Additionally, it was necessary to trace out device faults that were causing notifications.

Carbondale Rehabilitation & Nursing Center:

$83,490.00

Fire Alarm System Replacement

This project include the full replacement of the existing system with new upgraded system to monitor the existing facility and new fire sprinkler system. Replacement of the system included the monitoring panel, annunciators, and all system devices. Repairs in conjunction to the installation rounded out the completion of the project.

Northwestern School of Medicine - Department of General Medicine

12,000 sq ft complete build out from vanilla space. This included all data for 40 plus offices connected to Northwestern Hub located at separate building. High profile project for Northwestern. Duration: 16 weeks

Northwestern School of Medicine - Department of Endocrinology

15,000 sq ft.Build out from vanilla space. This includes all patient examining rooms, and fellows training area. High profile project for Northwestern. Duration: 20 weeks

American Technical Publishers (45,000 SF)

$11,000,000

Orland Park, IL

This project was a LEED gold project. Special construction items related to the LEED gold rating were an underfloor air system supported by VAC's, exterior sun shades, interior light shelves, FSC Certified millwork, and a building management system supported by CO2 sensors in all high occupancy areas. The DDC control system included a custom graphics package which identified each piece of equipment and its location in the building to help simplify tcolhe use of the system as well as offer a premium example of what can be done with DDC control systems which ATP used as examples in their technical manuals and training videos for the various unions and trade schools.

Motorola (135,000 SF)

$ 27,000,000

Elgin, IL

This project included 60,000 SF of raised access flooring to accommodate an under floor quick connect system of electrical, low voltage, and compressed air supporting their cell phone repair stations. The underfloor system was designed by us to increase Motorola's flexibility. This project included a fully integrated digital camera system, full service cooking cafeteria, and nurses station. The computer room was designed to accommodate Motorola's Midwestern operations in the event of a catastrophe at other facilities, which meant redundancy and emergency back-up built into all building systems.

Concentra Preferred Systems (69,000 SF)

$4,200,000

Naperville, IL

This project included an extensive electrical and low voltage package to accommodate their call center needs. This project also included a helipad for their senior management to commute.

Millward Brown (68,000 SF)

$ 3,900,000

Naperville, IL

Office build-out included large open office areas with cubicles and large quantities of break-out rooms and conference rooms for team marketing meetings and conference calls. Break-out rooms and conference rooms were set up for video conferencing.

Panalpina (35,000 SF)

$ 3,150,000

Elk Grove Village, IL

The office build out was a two story area located within their new air freight warehouse facility. The office area was completed in 4 weeks to meet an aggressive overall project schedule.

MDOT – District Headquarters (35,000 SF)

$5,200,000

Tupelo, MS

Plan and Spec build-to-suit, two story office building for the Mississippi Department of Transportation Headquarters. This project was their disaster recovery location for Mississippi.

Health & Human Services (26,000 SF)

$4,500,000

Bay St. Louis, MS

Plan and Spec build-to-suit, two story office building for the Hancock County Health & Human Services Department. This project accommodates the Health Department, Child Support, Economic Assistance, and Family & Child Services.

BRIO (25,000 SF)

$8,500,000

Germantown, WI

R&D facility for the largest wooden toy manufacturer in the world. Their office area included multiple play rooms where they observed children playing with their various products. Their lobby was designed to look like a child's bedroom, over scaled for an adult to give you the impression you were only 3 feet tall.

Sealed Air Corporation (20,000 SF)

$6,800,000

Hodgkins, IL

Addition and remodel of their existing office space while maintaining full operation of their business.

Atomatic Mechanical (20,000 SF)

$2,300,000

Arlington Heights, IL

Demolition and remodel of an existing office space.

Midwest Fuel Injection (20,000 SF)

$5,200,000

Bolingbrook, IL

Two story office build out within a warehouse space.

US Filter (14,000 SF)

$1,100,000

Naperville, IL

Demolition of multiple interior build-outs including a former law office and two other spaces, to meet the space requirements of US Filter. Extensive millwork added throughout to match the existing law office portion.

Soloman Smith Barney (9,400 SF)

Naperville, IL

Tenant Improvement within a multistory office building.

S3 Consulting (9,231 SF)

Naperville, IL

Tenant Improvement within a multistory office building.

ML Realty Partners (9,000 SF)

Tenant Improvement within a multistory office building.

Amica (7,000 SF)

Tenant Improvement within a multistory office building.

Imagetec (4,488 SF)

Tenant Improvement within a multistory office building.

Kerber Eck (4,136 SF)

Tenant Improvement within a multistory office building.

WIltel (4,040 SF)

Tenant Improvement within a multistory office building.

Holnam, Inc. (2,718 SF)

Tenant Improvement within a multistory office building.

EBC (2,000 SF)

Tenant Improvement within a multistory office building.

Weis Builders Chicago Corporate Headquarters (12,000 SF)

$1,800,000

Rolling Meadows, IL

Regional Headquarters for General Contractor

Principle Valuation, LLC (10,000 SF)

$625,000

Chicago, IL

Expansion of existing office

Verizon Wireless

$250,000

Chicago, IL

Construction of a soundproof international videoconference room.

Mid America Development Partners LLC (10,000 SF)

$1,300,000

Oakbrook, IL

Corporate headquarters for a commercial developer.

The Metropolitan Tower 242 Condominiums

$148,000,000

Adaptive re-use of an historic building erected in 1924 and the development team incorporated state of the art mechanical and fire safety systems. New cell boosts were installed which will allow residents to use their phone throughout the building, including the elevators and garage. Managed the general contractor/sub contractors/architect/structural engineer to deliver a complete building and condominiums within the projected Performa. Assisted in developing safety plans to ensure that all field work is being performed in a safe manner and in compliance with safety plans. Coordinated on site activities with client and subcontractors. Negotiated contracts with GC, developed budgets and compiled cost estimations Prepare and manage budgets and financial reporting as appropriate. Review financial statements, activity reports, and other performance data to measure productivity and goal achievement, to implement cost savings measures, and to make positive contributions to the companyʼs overall profitability. Directed weekly meetings to track changes, issues, change orders and administer PCOʼs, ECOʼs, etc…Interacted with buyers and represented the developer during walk throughs.

The Metropolitan Tower, The Park Monroe, Park Boulevard, The Columbian, Parkside of Old Town, Avenue East, The Strand, Dockside, 400 N LaSalle 474 N Lake Shore Drive

Interacted with the general contractors to ensure the requested changes to the advertised layouts could be achieved and ensured construction schedules were met. Investigated change orders from the field for validity and presented documentation to developers from the structural engineer, architect and general contractor for acceptance. Created the design centers to present the standard finishes and upgrades along with the design coordinators. Managed the selection process of the owners for their individual condominiums and deliver the requested construction requests. Was involved in the sales process when necessary to offer suggestions of past or possible changes allowed for construction. Managed the design coordinators and their scheduled deadlines to adhere to the construction and closing scheduled established by the bank. Represented the developers for the accurate construction of the upgrades for the purchased homes.

400 North LaSalle 414 Condominiums

$87,000,000

This project was a condominium conversion. Responsibilities were to build a sales center and four models prior to grand opening. Created the design centers to present the standard finishes and upgrades along with the design coordinators. Managed the selection process of the owners for their individual condominiums and deliver the requested construction requests. Managed to the budget and timeline established by the lending institution and developer. Walked the owners through their new homes prior to purchase and created punch list and schedule for completing items. Was involved in the sales process when necessary to offer suggestions of past or possible changes allowed for construction.